Demo Control Room
Run the sales demo in twenty minutes
Six beats, in order. Each one opens a live page of the demo workspace with seeded records behind it — the asset register, checklists, findings, gates and team companies all reference the same project, so nothing has to be hand-waved.
The data is sample data on a fictional campus. Demo workspaces are removed after a few days.
“This is what the project lead sees first thing — not a wall of charts, a list of what is owed and by whom.”
- What needs attention now — each row names the owner and the page that clears it
- Hard gates — what is physically blocked right now and why
- The stage ladder and the audit trail behind every number
“Twelve assets on a live build — some still on order, some received, some set and terminated, one ready to energize.”
- Procurement and readiness status per asset (OFCI vs CFCI)
- The checklists each asset carries for the stages it has reached
- Owner-furnished generators and who installs them
“Every line names its responsible party — GC, EC, the vendor, NETA, the CxA — so a checklist is a hand-off, not a form.”
- L1 factory tests, L2A receiving, L2B installation and RTE walk-downs
- Lines owned by another company are theirs to answer
- Evidence and readings where the line demands them
“A UPS battery string out of tolerance is not a note in a meeting — it is a finding on that asset, and it holds that asset.”
- Open findings by severity, each on its asset
- Who it is assigned to and what clears it
- The punch item next to the high-severity one — same register
“Ready-to-energize is derived from the record — nobody can declare it.”
- Gate status per asset and what is still missing
- The finding from beat 4 holding its asset
- Turnover as accepted evidence, not a folder of PDFs
“Log in as the CxA, the electrical contractor, the OEM or the owner with the passwords below — each company sees the project through its own seat.”
- Team companies with their trade scope, each accepted by its own admin
- Switch seats and watch page access change
- A refusal: a member company cannot change another company's scope
- Point at the open high-severity finding and ask what it costs them today when it is found at IST instead of at installation.
- Ask what their current answer is to “is this ready to energize” and how long it takes to assemble.
- Offer to set up their own company and first project — registration takes minutes and the demo becomes their job.